Method And Apparatus For Fast Data Rate Ramp Up In Node B Scheduling Of Ue Uplink - EP1712036

The patent EP1712036 was granted to Asset Trust on Aug 9, 2023. The application was originally filed on Dec 17, 2004 under application number EP04806378A. The patent is currently recorded with a legal status of "Patent Maintained As Amended".

EP1712036

ASSET TRUST
Application Number
EP04806378A
Filing Date
Dec 17, 2004
Status
Patent Maintained As Amended
Jul 7, 2023
Grant Date
Aug 9, 2023
External Links
Slate, Register, Google Patents

Patent Summary

Patent Family

Patent Family

Patent Oppositions

Patent oppositions filed by competitors challenge the validity of a granted patent. These oppositions are typically based on claims of prior art, lack of novelty, or non-obviousness. They are a key part of the process for determining a patent's strength and enforceability.

CompanyOpposition DateRepresentativeOpposition Status

Get instant alerts for new oppositions and patent status changes

GUANGDONG OPPO MOBILE TELECOMMUNICATIONSApr 1, 2021GULDE & PARTNERWITHDRAWN

Patent Citations (4) New

Patent citations refer to prior patents cited during different phases such as opposition or international search.

Citation PhasePublication NumberPublication Link
OPPOSITIONEP1712036
OPPOSITIONUS2002136286
OPPOSITIONUS2003007456
OPPOSITIONWO2005079139

Non-Patent Literature (NPL) Citations (5) New

NPL citations refer to non-patent references such as research papers, articles, or other publications cited during examination or opposition phases.

Citation PhaseReference TextLink
OPPOSITION- Nokia and Samsung, "Detailed description of Node B controlled rate scheduling: text proposal", 3GPP Draft; R1-031180 Consolidated TP for rate scheduling section, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, Lisbon, Portugal, (20031119), vol. RAN WG1-
OPPOSITION- Nokia and Samsung, "Detailed description of Node B controlled rate scheduling: text proposal", Detailed description of Node B controlled rate scheduling: text proposal 3GPP Draft; R1-031180 Consolidated TP for rate scheduling section, (20031119), pages 1 - 5, XP050098241-
SEARCH- NEC, "Efficient rate scheduling to support multiple transport channels", 3GPP DRAFT; R1-031201, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20031119), vol. RAN WG1, no. Lisbon, Portugal; 20031119, XP050098262 [A] 1-41 * page 2, paragraph 3; figures 1,2 *-
SEARCH- NOKIA AND SAMSUNG, "Detailed description of Node B controlled rate scheduling: text proposal", 3GPP DRAFT; R1-031180 CONSOLIDATED TP FOR RATE SCHEDULING SECTION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20031119), vol. RAN WG1, no. Lisbon, Portugal; 20031119, XP050098241 [X] 1-41 * page 3, paragraph 7.1.1.3.2 *-
SEARCH- SAMSUNG, "Node B controlled rate scheduling with fast ramping", 3GPP DRAFT; R1-030988 FAST RAMPING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20031002), vol. RAN WG1, no. Seoul, Korea; 20031002, XP050098075 [X] 1-41 * the whole document *-

Download Citation Report

Get a free citation report including examiner, opposition, and international search citations.

Get Citation Report

Dossier Documents

The dossier documents provide a comprehensive record of the patent’s prosecution history - including filings, correspondence, and decisions made by patent offices - and are crucial for understanding the patent’s legal journey and any challenges it may have faced during examination.

  • Date

    Description

  • Get instant alerts for new documents