Railway Train Operation Control Method And System

Patent No. EP3744605 (titled "Railway Train Operation Control Method And System") was filed by Crrc Changchun Railway Vehicles on Nov 22, 2019. The application was issued on Jan 4, 2023.

Patent Summary

A train operation control method based on a CTCS3+ATO system determines if automatic operation conditions are met, outputting prompt information (e.g., flickering buttons) if so. The train enters automatic operation mode upon triggering an ATO starting button on the driver platform. At intermediate stations (excluding starting/terminal stations), if the train is stationary in automatic mode and the ATO starting button is triggered, the system executes station automatic departure, section automatic operation, station automatic parking, door opening protection, and linked train/platform door control. Exit conditions for automatic mode include removal of tractions to $\ge$2 units, unavailable air brakes, speed limiting protection, service/emergency braking, isolated holding braking, or ineffective communication with the automatic operation system.

Patent Family

Patent Family

Patent Oppositions (9)

Patent oppositions filed by competitors challenge the validity of a granted patent. These oppositions are typically based on claims of prior art, lack of novelty, or non-obviousness. They are a key part of the process for determining a patent's strength and enforceability.

Dossier Documents

The dossier documents provide a comprehensive record of the patent's prosecution history - including filings, correspondence, and decisions made by patent offices - and are crucial for understanding the patent's legal journey and any challenges it may have faced during examination.

  • Date

    Description

  • Get instant alerts for new documents

EP3744605

CRRC CHANGCHUN RAILWAY VEHICLES
Application Number
EP19912800A
Filing Date
Nov 22, 2019
Status
Revoked
Oct 25, 2024
Publication Date
Jan 4, 2023